i-Vu® Lenel/S2 HVAC Schedule Optimization Add-On License; Requires ADD-OG-DIP

Item
ADD-OG-AOS
  • California Prop 65

APPLICATIONS

The OnGuard integration allows the i-Vu building automation system and an OnGuard security system to work together. The OnGuard integration solution consists of three add-ons that you can purchase based on your integration needs.

It starts with the Data Connector add-on, which provides the basic communication connection that is needed to transfer data to and from the OnGuard system. The Data Connector is a required component for the HVAC Schedule Optimization add-on.

The HVAC Schedule Optimization add-on predicts and schedules occupancy based on data that comes from the OnGuard system, which promotes optimized energy usage and occupant comfort.

FEATURES & BENEFITS

• Optimal Start Coupling - Supports comfort at typical occupancy, and covers “early birds”.
• Rolling Average by “Day of Week” - Evaluates each day of the week separately to account for daily variances.
• Dynamic Assessment - Responds to changes in occupancy profiles over time.
• Exception Handling - Analyzes data for unusual occupancy patterns such as holidays and discards them to avoid influencing predictions.

COMPATIBILITY

• i-Vu Pro v8.0 or newer
• Building Integration Platform 1.11 or newer
• OnGuard version must be:
• v7.5 or later, using the OpenAccess interface
• See requirements in OnGuard v1.1 Integration guide for more details
• Requires Data Connector add-on (Part# ADD-OG-DIP)

Safety Standards
California Prop 65 Yes
Weights and Dimensions
Operating Weight (lbs) 1
Exterior Dimensions (D) (inches) 1.000000
Exterior Dimensions (W) (inches) 1.000000
Exterior Dimensions (H) (inches) 1.000000
Shipping Weight (lbs) 1.000000