SCA NorCal Form

  • 1
  • 2
  • 3
  • 4
  • 5

This Claim Form can NOT be used for Equipment Exchanges (to exclude CBP Evaporative Coils and Thermostats). Please contact your local Technical Support Manager for consideration.

Application must be submitted to distributer with in 30 days of repair. Please verify warranty coverage below before submitting your application:

Warranty Lookup | Carrier Residential

Warranty Lookup | Bryant Residential


SECONDARY HEAT EXCHANGER INSPECTION SHEET MUST BE FILLED OUT AND TURNED INTO BRANCH TO RECIEVE LABOR BENEFIT ON THIS BULLETIN.

See counter associate if unsure of startup date.
This date must be with in 60 days of returning your failed part.
Drop files here or
0%

SERIAL NUMBERS OR DATE CODES ARE REQUIRED FOR ALL TSTAT. IF YOU HAVE ANY QUESTIONS OR IF YOU ARE UNSURE PLEASE CALL US.

  • Click the plus (+) to add additional rows for Failed Part Numbers.

SMB 09-0024A

A COPY OF THIS CERTIFICATE MUST BE HELD AT THE DISTRIBUTOR WITH THE PART OR FURNACE. FOLLOWING PART OR FURNACE SCRAPPING, RETAIN THE CERTIFICATE FOR POTENTIAL FACTORY AUDIT.

COMBUSTION TEST CHECKLIST

INSTALLATION CHECKLIST - CHECK ALL AREAS EXAMINED PER SMB-09-0022

INSTALLATION CHECKLIST - CHECK ALL ITEMS CLEANED OR EXAMINED PER SMB-09-0022

AFTER INSTALLATION AND MAINTENANCE ITEMS CORRECTED - COMBUSTION RETEST

VISUAL INSPECTION OF SECONDARY HEAT EXCHANGER

IF FURNACE IS REPLACED PROVIDE REPLACEMENT MODEL AND SERIAL NUMBER

(If your part(s) are not returned to Sigler, your warranty credit cannot be processed.)